µç³µÎÞÂë

The First Milestone of a Great Transformation

Date: 19 June 2017
Source:
The First Milestone of a Great Transformation
Photo source
www.wwglass.com

Date: 19 June 2017

The structure, clad in shingled unitized glass panels, is impressive and evokes a statement of modern sophistication.

It’s been highly anticipated, and it didn’t disappoint. The Hudson Yards project, the largest private development project in New York City’s history, has recently made the first step towards completion with the opening of its first building, 10 Hudson Yards.

When the entire initiative is completed in 2025, more than 125,000 people a day will either visit, work at, or call their home Hudson Yards.

The First Milestone of a Great Transformation

10 Hudson Yards is located at the northwest corner of Tenth Avenue and West 30th Street. It has connected access to the High Line on the Southwest corner, while the elevated walkway runs parallel in front of the lobby to the South.

It is also conveniently located near the new station for the 7 Train Extension. Designed by KPF, the 52-story building ascends to 895 feet. It contains a mix of tenants from name brand retailer Coach, to technology company SAP and cosmetic giant L’Oreal, to name a few.

The structure, clad in shingled unitized glass panels, is impressive and evokes a statement of modern sophistication.

The building’s crystalline structure terminates in a dramatic point at the top and has columns at the base that straddle over the High Line.

The entire building encompasses 1.8 million square feet. Some of the most exciting aspects of the project are the structural glass feature walls for for the lobby and atrium engineered and installed by W&W µç³µÎÞÂë.

The First Milestone of a Great Transformation
Photo Credit: http://newyorkyimby.com/

W&W µç³µÎÞÂë used Optiwhite Low-Iron SGP Laminated µç³µÎÞÂë with Ipasol Bright Low-e on the #2 surface for the Pilkington Planarâ„¢ point-supported cable walls.

Custom stainless steel patch fittings and Galfan link-locked cables serve as the support hardware for the 10’ wide glass panels.

The 82-foot tall transparent structural glass lobby walls cloak the entire South podium and portions of the West and East.

One of the engineering marvels on this facade are the two 10-foot-wide structureless corners supported only by thin stainless steel angles bonded to the inner corners.

The Coach atrium is a 207-foot tall trapezoid-shaped Pilkington Planarâ„¢ Optiwhite low-iron laminated glass tension cable facade spanning from floors 6 to 21.

This wall is highly visible from the High Line when approaching the tower from the South. The interior features a dramatic, high-span open atrium with inset one and two-story, full-height low-iron glass conference rooms on either side.

Metal panel coping with LED lights line each level to create a dramatic display of depth. Low-iron floor to ceiling glass corridors in the atrium offer a clear view of the High Line walkway below and downtown Manhattan as well.

The First Milestone of a Great Transformation
Photo Credit: http://newyorkyimby.com/

Once the project is completed, this progressive expansion will generate approximately $477 million in New York City tax revenues and an estimated $89 million in dedicated MTA taxes and ground lease payments.

According to officials at the MTA, this would be enough to either renovate four subway stations, purchase 35 new subway cars, replace 3.6 miles of track and switches, or purchase 136 new houses.

Hudson Yards will completely transform the area by providing a much-needed connection between the neighborhood districts of Chelsea and Clinton.

From a residential perspective, it will also provide housing, public open space, and amenities that experts say are more critical today than ever before for new developments to thrive.

The photos really tell the story. Click to take a first look at all of the great photos showing W&W µç³µÎÞÂë’ work on the lobby walls, Coach atrium wall, and interior glass conference rooms. (Photos courtesy of Yimby, 2016) 

For more information on all the projects completed and underway by W&W µç³µÎÞÂë, go to and look under the Portfolio Section.

600450 The First Milestone of a Great Transformation µç³µÎÞÂë

Others also read

Watch the AT online panel discussion, in partnership with Kuraray, on avoiding risk when specifying structural glass.
The 151st global edition of the Zak World of Façades conference was held on 5th June 2024, at The Hall, Zurich.
This event, brought to you by Architecture Today and Kuraray, will delve into the critical aspects of ensuring safety in architectural projects by avoiding counterfeit materials. Secure your spot for live sessions on June 25 or June 27.
Join Architecture Today's online panel discussion in June featuring experts from Arup, Eckersley O’Callaghan, WSP, Kuraray, Building Sciences, and Alpha Consulting.
Royal Jaarbeurs has announced a new biennial trade event in spring 2025 for the European facade industry: Future Facade.
At the centre of this project is the use of OKALUX's innovative KAPILUX W glass.

Add new comment

From industry

2200 W. Salzburg Rd.
Auburn , MI 48611
United States

NEWS RELATED PRODUCTS